- Category: time tracking software
- Auth: API_KEY
- Composio-managed OAuth available? N/A
- Tools: 14
- Triggers: 0
- Slug:
WORKSNAPS - Version: 20261101_00
Tools
Create Project
Create Project
Slug:
WORKSNAPS_CREATE_PROJECTCreates a new project in Worksnaps for tracking time and tasks. Use this tool when you need to set up a new project for time tracking. Projects serve as containers for tasks and time entries. Each project must have a unique name within the account. Note: Account plan limits may restrict the number of projects that can be created.Input Parameters
Output
Create task
Create task
Delete Task
Delete Task
Slug:
WORKSNAPS_DELETE_TASKPermanently deletes a task from a Worksnaps project. This action is destructive and cannot be undone. Use GET_TASKS first to find the task_id, and GET_PROJECTS to find the project_id. Returns success=true if the task was deleted. Returns 404 error if project or task does not exist.Input Parameters
The unique ID of the task to delete. Can be obtained from GET_TASKS or CREATE_TASK actions.
The unique ID of the Worksnaps project that contains the task. Can be obtained from GET_PROJECTS or GET_PROJECT_DETAILS actions.
Output
Get Project Details
Get Project Details
Get Project Report
Get Project Report
Slug:
WORKSNAPS_GET_PROJECT_REPORTRetrieves individual Worksnaps time entries for a project and timestamp range, with the total duration in minutes. Optionally filter by user IDs, task IDs, or online versus offline entries. Timestamps must be Unix seconds at 10-minute interval boundaries; a bad request can also return an empty report.Input Parameters
Optional semicolon-separated list of user IDs to filter time entries (e.g., ‘123;456’). If not provided, returns entries for all users in the project.
End of the time range as a Unix timestamp (seconds since epoch). Must be at a 10-minute interval boundary and after from_timestamp.
Start of the time range as a Unix timestamp (seconds since epoch). Must be at a 10-minute interval boundary.
Optional filter by time entry type. Use ‘online’ for tracked time with screenshots or ‘offline’ for manual entries.
Output
Get Projects
Get Projects
Get Task Details
Get Task Details
Get Project Tasks
Get Project Tasks
Get User Account
Get User Account
Get User Assignments
Get User Assignments
Get Users
Get Users
Update Project
Update Project
Update Task
Update Task
Slug:
WORKSNAPS_PUT_UPDATE_TASKTool to update details of an existing task. Use when you have project_id, task_id, and fields to update.Input Parameters
New task status: ‘open’ or ‘closed’. Note: Must be combined with ‘name’ or ‘description’ update.
New due date in YYYY-MM-DD format. Note: Must be combined with ‘name’ or ‘description’ update.
Output
Update User Account
Update User Account